The project will widen the already channelized river as it flows between Lakeland Drive and the I-20/I-55 interchange and set back portions of the existing levee system to create more conveyance and capacity. The excavated materials will be deposited adjacent to the existing levees. This project will improve flood risk management for high water events like 1979 and 1983 without backing up into neighborhoods, homes, and businesses.